Blythwood Addition

Second-storey addition and main floor reconfiguration adding three bedrooms, two bathrooms, and a new attached garage with stone and stucco facade.

Home with new second-storey addition, stone and stucco facade, at dusk
Location
84 Blythwood Road, Toronto, ON M4N 1A4
Scope
1,700 sq. ft. second-storey addition
Duration
10 months · Completed 2024

Project overview

The homeowners wanted more space without leaving their street, so AceWorld added a full second storey and reworked the main floor beneath it.

Existing footings and framing were reinforced to carry the new load, then the addition was framed, roofed, and closed in ahead of winter.

The completed home adds three bedrooms, two bathrooms, a laundry room, and an attached double garage with a new stone and stucco exterior.

Highlights

  • Closed in before winter to protect the schedule
  • Existing foundation reinforced for the new storey
  • Three bedrooms and two bathrooms added

Photo gallery

Two-storey home with new addition lit at dusk
Completed addition and new garage
New upper floor bathroom with glass shower
New upper-floor bathroom
Reconfigured main floor kitchen
Reconfigured main floor

More projects